Open every day, 6am – 6pmBased in Pickering · Covering Ryedale, the coast & York
AC Roofing
AC Roofing services

Re-roofing & new roofs

When patching isn't worth it any more, we strip the old roof right back and build it again properly, with a 20-year guarantee on every roof replacement.

  • 20-year guarantee on every roof replacement
  • Owner Adam prices every job himself
  • Free, no-obligation quotes

Get your free roofing quote

Adam will get back to you, usually the same day. No obligation.

By sending this you agree to us contacting you about your quote. See our privacy notice.

20-year guaranteeon every roof replacement
Owner-ledAdam prices every job himself
Free roof inspectiondrone check, no obligation
7 days a week6am – 6pm, every day

When is it time for a new roof?

Most roofs don't fail all at once. It starts with a slipped tile, a damp patch on the bedroom ceiling or mortar falling off the ridge, and the repairs keep coming back. If your roof is old, the felt underneath has perished or you're paying for patch repairs every winter, a re-roof is usually the better long-term fix.

Adam will come out, check the roof properly (with the drone where needed) and tell you honestly whether it needs replacing or whether a repair will do.

  • New breathable membrane and treated battens
  • New concrete or clay tiles to suit your house
  • Dry-fix ridge and verge systems (no mortar to crumble)
  • New lead flashings around chimneys and abutments
  • Scaffolding, skips and waste removal all included
  • 20-year guarantee on every roof replacement
A finished re-roof in Whitby, walked through by Adam
On a real job

How we do it

  1. Old tiles, battens and perished felt removed, and the timbers checked.
    1. Strip back Old tiles, battens and perished felt removed, and the timbers checked.
  2. A breathable membrane and new treated battens go on.
    2. New membrane & battens A breathable membrane and new treated battens go on.
  3. New tiles laid and fixed, with cuts done neatly around chimneys and valleys.
    3. Tiles on New tiles laid and fixed, with cuts done neatly around chimneys and valleys.
  4. Dry-fix ridge and verge, new lead, and the site left tidy.
    4. Finished properly Dry-fix ridge and verge, new lead, and the site left tidy.

Questions

How long does a re-roof take?

It depends on the size of the roof and the weather. Adam will give you a realistic timescale when he quotes.

Do I need to move out while you re-roof?

No. The work is all done from the outside and the roof is kept watertight at the end of each day.

Do you sort the scaffolding and skips?

Yes. Scaffolding, waste removal and materials are all organised by us, so you only deal with one company.

What guarantee do I get?

Every roof replacement comes with a 20-year guarantee.

Worried about your roof?

Get it looked at before it gets worse. Free, no-obligation quotes from Adam.

CallWhatsAppFree quote